Crockagarron Ext is an operational 2.5 MW onshore wind farm in Fermanagh and Omagh, generating since 1 June 2012. Planning permission was granted on 8 December 2010, 21 months after submission. Operator of record: Northern Wind Power�.

2.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1 June 2012
Wind Onshore
Technology
Northern Wind Power�
Fermanagh and Omagh
Authority
Northern Ireland

Planning and build timeline

Application submitted4 March 2009
Permission granted8 December 2010
21 months after submission
Operational1 June 2012
18 months after consent

Screening a site of your own?

RedlineUK · £39

Fermanagh and Omagh approves 92% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Crockagarron Ext’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Fermanagh and Omagh’s record on onshore wind

Fermanagh and Omagh has decided 66 onshore wind schemes and approved 92%, taking a median of 20.9 months. See every onshore wind scheme decision in Fermanagh and Omagh

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
150.5 km
Wind Onshore · Operational
151.1 km
Wind Onshore · Operational
13.81.7 km
Wind Onshore · Operational
7.52.5 km
Wind Onshore · Operational
12.53.2 km
Wind Onshore · Operational
6.94.3 km
Wind Onshore · Operational
7.16.4 km
Wind Onshore · Operational
27.8 km

How big is Crockagarron Ext?

Crockagarron Ext has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Crockagarron Ext?

REPD records the operator as Northern Wind Power�. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crockagarron Ext approved and built?

The application was submitted on 4 March 2009. Permission was granted on 8 December 2010, 21 months later. The site became operational on 1 June 2012, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3717.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode