Crockagarron Ext is operational in Fermanagh and Omagh with a recorded capacity of 2.5 MW, and has been generating since 2012-06-01.

2.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-06-01
Wind Onshore
Technology
Northern Wind Power�
Fermanagh and Omagh
Authority
Northern Ireland

Planning and build timeline

Application submitted2009-03-04
Permission granted2010-12-08
21 months after submission
Operational2012-06-01
18 months after consent

Fermanagh and Omagh’s record on onshore wind

Fermanagh and Omagh has decided 66 onshore wind schemes and approved 92%, taking a median of 20.9 months. See every onshore wind scheme decision in Fermanagh and Omagh

Other built sites within 15 km

SiteMWDistance
Crockagarran
Wind Onshore · Operational
150.5 km
Gortfinbar
Wind Onshore · Operational
151.1 km
Inishative
Wind Onshore · Operational
13.81.7 km
Crockbaravally Wind Farm
Wind Onshore · Operational
7.52.5 km
Crockdun
Wind Onshore · Operational
12.53.2 km
Eshmore
Wind Onshore · Operational
6.94.3 km
Altamuskin
Wind Onshore · Operational
7.16.4 km
Crockbrack
Wind Onshore · Operational
27.8 km

How big is Crockagarron Ext?

Crockagarron Ext has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Crockagarron Ext?

REPD records the operator as Northern Wind Power�. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crockagarron Ext approved and built?

The application was submitted on 2009-03-04. Permission was granted on 2010-12-08, 21 months later. The site became operational on 2012-06-01, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3717.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council