Renewable sites › Condover (Green Farm)
Condover (Green Farm)
Condover (Green Farm) is operational in Shropshire with a recorded capacity of 10.2 MW, and has been generating since 2015-03-24.
Planning and build timeline
| Application submitted | 2013-09-03 |
| Permission granted | 2014-01-09 4 months after submission |
| Operational | 2015-03-24 14 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Shropshire’s record on solar
Shropshire has decided 68 solar farms and approved 94%, taking a median of 3.2 months. See every solar farm decision in Shropshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Betton Abbots Landfill Gas · Operational | 1.3 | 1.6 km |
Condover Airfield Solar Photovoltaics · Operational | 12.3 | 2.7 km |
Pitchford Solar Photovoltaics · Operational | 10.2 | 4 km |
Sundorne Grove Solar Photovoltaics · Operational | 20 | 8.8 km |
Battlefield EfW EfW Incineration · Operational | 8 | 9.5 km |
Tiddiecross Solar Farm Solar Photovoltaics · Operational | 10.5 | 11.7 km |
Rushmoor Lane Farm (Cheshire Coppice) Solar Photovoltaics · Operational | 5 | 14.3 km |
Hayford Farm - extension Solar Photovoltaics · Operational | 8.2 | 14.7 km |
How big is Condover (Green Farm)?
Condover (Green Farm) has a recorded installed capacity of 10.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Condover (Green Farm)?
REPD records the operator as NextEnergy Solar Fund. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Condover (Green Farm) approved and built?
The application was submitted on 2013-09-03. Permission was granted on 2014-01-09, 4 months later. The site became operational on 2015-03-24, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1485.