Novarly ParcelRenewable sites

Renewable sitesBattlefield EfW

Battlefield EfW

Battlefield EfW is operational in Shropshire with a recorded capacity of 8 MW, and has been generating since 2015-05-01.

8 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-05-01
EfW Incineration
Technology
Veolia
Shropshire
Authority
England

Planning and build timeline

Application submitted2009-01-21
Permission granted2012-01-10
36 months after submission
Operational2015-05-01
40 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Sundorne Grove
Solar Photovoltaics · Operational
201.6 km
Betton Abbots
Landfill Gas · Operational
1.38.1 km
Condover (Green Farm)
Solar Photovoltaics · Operational
10.29.5 km
Charity Farm (Burlton Solar Farm)
Solar Photovoltaics · Operational
14.410.7 km
Tiddiecross Solar Farm
Solar Photovoltaics · Operational
10.511.2 km
Land To The North Of Moor Farm
Solar Photovoltaics · Operational
3.811.6 km
Rushmoor Lane Farm (Cheshire Coppice)
Solar Photovoltaics · Operational
511.9 km
Condover Airfield
Solar Photovoltaics · Operational
12.312.2 km

How big is Battlefield EfW?

Battlefield EfW has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Battlefield EfW?

REPD records the operator as Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Battlefield EfW approved and built?

The application was submitted on 2009-01-21. Permission was granted on 2012-01-10, 36 months later. The site became operational on 2015-05-01, 40 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 910.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council