Renewable sites › Cannington Cold Stores
Cannington Cold Stores
Cannington Cold Stores is operational in Somerset with a recorded capacity of 3.3 MW, and has been generating since 2009-07-29.
Planning and build timeline
| Application submitted | 2008-01-25 |
| Permission granted | 2008-12-22 11 months after submission |
| Operational | 2009-07-29 7 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Cobbs Cross Solar Park Solar Photovoltaics · Operational | 5 | 5.5 km |
Showground Road EfW Incineration · Under Construction | 7.8 | 8.5 km |
Horsey Levels - Solar Farm Solar Photovoltaics · Operational | 24 | 8.5 km |
Lower Marsh Farm Solar Photovoltaics · Operational | 5 | 8.8 km |
Walpole Landfill AD (Waste AD) Anaerobic Digestion · Operational | 1.6 | 9.1 km |
Walpole Landfill Landfill Gas · Operational | 1.6 | 9.1 km |
Puriton Landfill Solar Farm Solar Photovoltaics · Operational | 11.4 | 9.1 km |
Park Wall Solar Park Solar Photovoltaics · Operational | 5 | 9.2 km |
How big is Cannington Cold Stores?
Cannington Cold Stores has a recorded installed capacity of 3.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Cannington Cold Stores?
REPD records the operator as Cannington Bioenergy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Cannington Cold Stores approved and built?
The application was submitted on 2008-01-25. Permission was granted on 2008-12-22, 11 months later. The site became operational on 2009-07-29, 7 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 277.