Novarly ParcelRenewable sites

Renewable sitesAstley Solar Farm

Astley Solar Farm

Astley Solar Farm is operational in Shropshire with a recorded capacity of 5 MW, and has been generating since 2016-03-15.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-15
Solar Photovoltaics
Technology
Rockfire Capital
Shropshire
Authority
England

Planning and build timeline

Application submitted2015-05-14
Permission granted2015-09-30
5 months after submission
Operational2016-03-15
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Shropshire’s record on solar

Shropshire has decided 68 solar farms and approved 94%, taking a median of 3.2 months. See every solar farm decision in Shropshire

Other built sites within 15 km

SiteMWDistance
Swancote Farm
Anaerobic Digestion · Operational
1.29.3 km
Swancote Farm AD (Farm AD)
Anaerobic Digestion · Operational
2.29.3 km
The Kingswinford School - Solar panels
Solar Photovoltaics · Operational
11.3 km
Himley Wood Landfill Site
Landfill Gas · Operational
4.413 km
Upper Meadowley Farm
Solar Photovoltaics · Operational
10.713.3 km

How big is Astley Solar Farm?

Astley Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Astley Solar Farm?

REPD records the operator as Rockfire Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Astley Solar Farm approved and built?

The application was submitted on 2015-05-14. Permission was granted on 2015-09-30, 5 months later. The site became operational on 2016-03-15, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5266.

Novarly Parcel · official public data, read properly · parcel.novarly.com