Novarly ParcelRenewable sites

Renewable sitesWest Holcombe

West Holcombe

West Holcombe is a 5.5 MW solar farm under construction in Mid Devon. Planning permission was granted on 24 June 2015, 10 months after submission. Operator of record: Wessex Solar Energy.

5.5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Wessex Solar Energy
Mid Devon
Authority
England

Planning and build timeline

Application submitted28 August 2014
Permission granted24 June 2015
10 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Mid Devon approves 80% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with West Holcombe’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Mid Devon’s record on solar

Mid Devon has decided 30 solar farms and approved 80%, taking a median of 2.9 months. See every solar farm decision in Mid Devon

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
2.910.2 km
Solar Photovoltaics · Operational
512.1 km
Solar Photovoltaics · Operational
1.212.4 km
Solar Photovoltaics · Operational
4.812.5 km
Solar Photovoltaics · Operational
3.113.9 km
Solar Photovoltaics · Operational
1.514.3 km
Solar Photovoltaics · Operational
3.514.5 km
Solar Photovoltaics · Operational
514.7 km

How big is West Holcombe?

West Holcombe has a recorded installed capacity of 5.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates West Holcombe?

REPD records the operator as Wessex Solar Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was West Holcombe approved and built?

The application was submitted on 28 August 2014. Permission was granted on 24 June 2015, 10 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5255.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode