Renewable sites › Uckfield Leisure Centre - Solar PV System
Uckfield Leisure Centre - Solar PV System
Uckfield Leisure Centre - Solar PV System is a solar farm under construction in Wealden. REPD does not record the planning grant date. Operator of record: Wealden District Council.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | not recorded |
Screening a site of your own?
Wealden approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Uckfield Leisure Centre - Solar PV System’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Wealden’s record on solar
Wealden has decided 26 solar farms and approved 96%, taking a median of 2.3 months. See every solar farm decision in Wealden →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 4.6 km |
Solar Photovoltaics · Operational | 4.9 | 7.5 km |
Solar Photovoltaics · Operational | 8.1 | 10.4 km |
Solar Photovoltaics · Operational | 2.6 | 10.4 km |
Solar Photovoltaics · Operational | 7 | 11.9 km |
Solar Photovoltaics · Operational | 5 | 12.5 km |
Solar Photovoltaics · Operational | 8.2 | 14 km |
Landfill Gas · Operational | 7.5 | 14.5 km |
How big is Uckfield Leisure Centre - Solar PV System?
REPD does not record an installed capacity for Uckfield Leisure Centre - Solar PV System.
Who operates Uckfield Leisure Centre - Solar PV System?
REPD records the operator as Wealden District Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Uckfield Leisure Centre - Solar PV System approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 20142.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode