Uckfield Leisure Centre - Solar PV System

Uckfield Leisure Centre - Solar PV System is under construction in Wealden.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Wealden District Council
Wealden
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wealden’s record on solar

Wealden has decided 26 solar farms and approved 96%, taking a median of 2.3 months. See every solar farm decision in Wealden

Other built sites within 15 km

SiteMWDistance
Bentley Estate
Solar Photovoltaics · Operational
54.6 km
Land at Upper Clayhill Farm
Solar Photovoltaics · Operational
4.97.5 km
Horam
Solar Photovoltaics · Operational
8.110.4 km
Stone Hill
Solar Photovoltaics · Operational
2.610.4 km
Laughton Level
Solar Photovoltaics · Operational
711.9 km
Land At Chiddinglye Farm
Solar Photovoltaics · Operational
512.5 km
Berwick solar farm
Solar Photovoltaics · Operational
8.214 km
Beddingham 'B' Landfill Scheme
Landfill Gas · Operational
7.514.5 km

How big is Uckfield Leisure Centre - Solar PV System?

REPD does not record an installed capacity for Uckfield Leisure Centre - Solar PV System.

Who operates Uckfield Leisure Centre - Solar PV System?

REPD records the operator as Wealden District Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Uckfield Leisure Centre - Solar PV System approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 20142.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council