Renewable sites › Bentley Estate
Bentley Estate
Bentley Estate is operational in Wealden with a recorded capacity of 5 MW, and has been generating since 2015-12-17.
Planning and build timeline
| Application submitted | 2014-06-20 |
| Permission granted | 2015-07-23 13 months after submission |
| Operational | 2015-12-17 5 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Wealden’s record on solar
Wealden has decided 26 solar farms and approved 96%, taking a median of 2.3 months. See every solar farm decision in Wealden →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land at Upper Clayhill Farm Solar Photovoltaics · Operational | 4.9 | 4.4 km |
Uckfield Leisure Centre - Solar PV System Solar Photovoltaics · Under Construction | — | 4.6 km |
Laughton Level Solar Photovoltaics · Operational | 7 | 7.3 km |
Stone Hill Solar Photovoltaics · Operational | 2.6 | 8.3 km |
Horam Solar Photovoltaics · Operational | 8.1 | 8.9 km |
Berwick solar farm Solar Photovoltaics · Operational | 8.2 | 9.7 km |
Beddingham 'B' Landfill Scheme Landfill Gas · Operational | 7.5 | 10.3 km |
Wilbees Farm Solar Photovoltaics · Operational | 5 | 11.8 km |
How big is Bentley Estate?
Bentley Estate has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bentley Estate?
REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bentley Estate approved and built?
The application was submitted on 2014-06-20. Permission was granted on 2015-07-23, 13 months later. The site became operational on 2015-12-17, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2132.