Tor Achilty

Tor Achilty is operational in Highland with a recorded capacity of 15 MW, and has been generating since 1954-04-01.

15 MW
Capacity
as recorded in REPD
Operational
Status
since 1954-04-01
Large Hydro
Technology
Scottish and Southern Energy (SSE)
Highland
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1954-04-01

Other built sites within 15 km

SiteMWDistance
Fairburn
Wind Onshore · Operational
433.1 km
Orrin
Large Hydro · Operational
183.6 km
Aigas
Large Hydro · Operational
2011.2 km
Kilmorack
Large Hydro · Operational
2011.4 km

How big is Tor Achilty?

Tor Achilty has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Tor Achilty?

REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Tor Achilty approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1954-04-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 401.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council