Renewable sitesFairburn

Fairburn

Fairburn is an operational 43 MW onshore wind farm in Highland, generating since 7 June 2010. Planning permission was granted on 1 January 2008, 32 months after submission. Operator of record: Scottish and Southern Energy (SSE).

43 MW
Capacity
as recorded in REPD
Operational
Status
since 7 June 2010
Wind Onshore
Technology
Scottish and Southern Energy (SSE)
Highland
Authority
Scotland

Planning and build timeline

Application submitted10 May 2005
Permission granted1 January 2008
32 months after submission
Operational7 June 2010
29 months after consent

Screening a site of your own?

RedlineUK · £39

Highland approves 63% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Fairburn’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Large Hydro · Operational
153.1 km
Large Hydro · Operational
184.4 km
Large Hydro · Operational
209.9 km
Large Hydro · Operational
2010.6 km

How big is Fairburn?

Fairburn has a recorded installed capacity of 43 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fairburn?

REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fairburn approved and built?

The application was submitted on 10 May 2005. Permission was granted on 1 January 2008, 32 months later. The site became operational on 7 June 2010, 29 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4675.