Renewable sites › Orrin
Orrin
Orrin is operational in Highland with a recorded capacity of 18 MW, and has been generating since 1959-01-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1959-01-01 |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Tor Achilty Large Hydro · Operational | 15 | 3.6 km |
Fairburn Wind Onshore · Operational | 43 | 4.4 km |
Kilmorack Large Hydro · Operational | 20 | 7.9 km |
Aigas Large Hydro · Operational | 20 | 8.1 km |
How big is Orrin?
Orrin has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Orrin?
REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Orrin approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1959-01-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 400.