Thorfinn Wind Farm - NM2000
Thorfinn Wind Farm - NM2000 is an operational 2.3 MW onshore wind farm in Orkney Islands, generating since 1 April 2000. Planning permission was granted on 22 November 1999, 13 months after submission. Operator of record: Vestas.
Planning and build timeline
| Application submitted | 23 October 1998 |
| Permission granted | 22 November 1999 13 months after submission |
| Operational | 1 April 2000 4 months after consent |
Screening a site of your own?
Orkney Islands approves 93% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Thorfinn Wind Farm - NM2000’s recorded coordinate — swap in your own postcode or coordinates.
Orkney Islands’s record on onshore wind
Orkney Islands has decided 28 onshore wind schemes and approved 93%, taking a median of 6.2 months. See every onshore wind scheme decision in Orkney Islands →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 1.5 | 0.5 km |
Wind Onshore · Operational | 5 | 1.1 km |
Wind Onshore · Operational | 2.3 | 1.1 km |
Wind Onshore · Operational | 4.3 | 4.2 km |
How big is Thorfinn Wind Farm - NM2000?
Thorfinn Wind Farm - NM2000 has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Thorfinn Wind Farm - NM2000?
REPD records the operator as Vestas. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Thorfinn Wind Farm - NM2000 approved and built?
The application was submitted on 23 October 1998. Permission was granted on 22 November 1999, 13 months later. The site became operational on 1 April 2000, 4 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3308.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode