Stroupster Wind Farm - additional turbine
Stroupster Wind Farm - additional turbine is an operational 2.3 MW onshore wind farm in Highland, generating since 15 October 2015. Planning permission was granted on 20 January 2014, 2 months after submission. Operator of record: Greencoat UK Wind/Bay Wa .r.e/ SunGift.
Planning and build timeline
| Application submitted | 5 November 2013 |
| Permission granted | 20 January 2014 2 months after submission |
| Operational | 15 October 2015 21 months after consent |
Screening a site of your own?
Highland approves 63% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Stroupster Wind Farm - additional turbine’s recorded coordinate — swap in your own postcode or coordinates.
Highland’s record on onshore wind
Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 29.9 | 0.9 km |
Wind Onshore · Operational | 9.2 | 7.8 km |
Wind Onshore · Operational | 48.3 | 14.6 km |
How big is Stroupster Wind Farm - additional turbine?
Stroupster Wind Farm - additional turbine has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Stroupster Wind Farm - additional turbine?
REPD records the operator as Greencoat UK Wind/Bay Wa .r.e/ SunGift. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Stroupster Wind Farm - additional turbine approved and built?
The application was submitted on 5 November 2013. Permission was granted on 20 January 2014, 2 months later. The site became operational on 15 October 2015, 21 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3433.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode