Novarly ParcelRenewable sites

Renewable sitesSouth Shore Holiday Village

South Shore Holiday Village

South Shore Holiday Village is operational in East Riding of Yorkshire with a recorded capacity of 0.4 MW, and has been generating since 2021-05-18.

0.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-05-18
Solar Photovoltaics
Technology
East Riding of Yorkshire Council
East Riding of Yorkshire
Authority
England

Planning and build timeline

Application submitted2019-06-25
Permission granted2020-12-14
18 months after submission
Operational2021-05-18
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Riding of Yorkshire’s record on solar

East Riding of Yorkshire has decided 57 solar farms and approved 100%, taking a median of 2.2 months. See every solar farm decision in East Riding of Yorkshire

Other built sites within 15 km

SiteMWDistance
Fraisthorpe Wind Farm
Wind Onshore · Operational
29.71.8 km
Lissett Airfield Wind Farm
Wind Onshore · Operational
307.7 km

How big is South Shore Holiday Village?

South Shore Holiday Village has a recorded installed capacity of 0.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates South Shore Holiday Village?

REPD records the operator as East Riding of Yorkshire Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was South Shore Holiday Village approved and built?

The application was submitted on 2019-06-25. Permission was granted on 2020-12-14, 18 months later. The site became operational on 2021-05-18, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7559.

Novarly Parcel · official public data, read properly · parcel.novarly.com