Fraisthorpe Wind Farm
Fraisthorpe Wind Farm is an operational 29.7 MW onshore wind farm in East Riding of Yorkshire, generating since 15 June 2016. Planning permission was granted on 22 January 2013, 11 months after submission. Operator of record: Octopus Investments.
Planning and build timeline
| Application submitted | 10 February 2012 |
| Permission granted | 22 January 2013 11 months after submission |
| Operational | 15 June 2016 41 months after consent |
Screening a site of your own?
East Riding of Yorkshire approves 82% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Fraisthorpe Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Riding of Yorkshire’s record on onshore wind
East Riding of Yorkshire has decided 55 onshore wind schemes and approved 82%, taking a median of 7.8 months. See every onshore wind scheme decision in East Riding of Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 0.4 | 1.8 km |
Wind Onshore · Operational | 30 | 5.9 km |
How big is Fraisthorpe Wind Farm?
Fraisthorpe Wind Farm has a recorded installed capacity of 29.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Fraisthorpe Wind Farm?
REPD records the operator as Octopus Investments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Fraisthorpe Wind Farm approved and built?
The application was submitted on 10 February 2012. Permission was granted on 22 January 2013, 11 months later. The site became operational on 15 June 2016, 41 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4647.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode