North Quay ERF is operational in Lewes with a recorded capacity of 18.3 MW, and has been generating since 2012-02-01.

18.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-02-01
EfW Incineration
Technology
Veolia
Lewes
Authority
England

Planning and build timeline

Application submitted2005-12-02
Permission granted2007-02-21
15 months after submission
Operational2012-02-01
59 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Beddingham 'B' Landfill Scheme
Landfill Gas · Operational
7.56.6 km
Laughton Level
Solar Photovoltaics · Operational
78.3 km
Wilbees Farm
Solar Photovoltaics · Operational
58.4 km
Berwick solar farm
Solar Photovoltaics · Operational
8.28.8 km
Natewood Farm
Solar Photovoltaics · Operational
8.911.3 km
Eastbourne District General Hospital - Energy Management
Solar Photovoltaics · Operational
1.112.5 km
Shepham Lane
Wind Onshore · Operational
7.513 km
Land at Upper Clayhill Farm
Solar Photovoltaics · Operational
4.913.6 km

How big is North Quay ERF?

North Quay ERF has a recorded installed capacity of 18.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates North Quay ERF?

REPD records the operator as Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was North Quay ERF approved and built?

The application was submitted on 2005-12-02. Permission was granted on 2007-02-21, 15 months later. The site became operational on 2012-02-01, 59 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 899.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council