Novarly ParcelRenewable sites

Renewable sitesNorth Quay ERF

North Quay ERF

North Quay ERF is an operational 18.3 MW energy-from-waste plant in Lewes, generating since 1 February 2012. Planning permission was granted on 21 February 2007, 15 months after submission. Operator of record: Veolia.

18.3 MW
Capacity
as recorded in REPD
Operational
Status
since 1 February 2012
EfW Incineration
Technology
Veolia
Lewes
Authority
England

Planning and build timeline

Application submitted2 December 2005
Permission granted21 February 2007
15 months after submission
Operational1 February 2012
59 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Lewes: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with North Quay ERF’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
7.56.6 km
Solar Photovoltaics · Operational
78.3 km
Solar Photovoltaics · Operational
58.4 km
Solar Photovoltaics · Operational
8.28.8 km
Solar Photovoltaics · Operational
8.911.3 km
Solar Photovoltaics · Operational
1.112.5 km
Wind Onshore · Operational
7.513 km
Solar Photovoltaics · Operational
4.913.6 km

How big is North Quay ERF?

North Quay ERF has a recorded installed capacity of 18.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates North Quay ERF?

REPD records the operator as Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was North Quay ERF approved and built?

The application was submitted on 2 December 2005. Permission was granted on 21 February 2007, 15 months later. The site became operational on 1 February 2012, 59 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 899.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode