Novarly ParcelRenewable sites

Renewable sitesEastbourne District General Hospital - Energy Management

Eastbourne District General Hospital - Energy Management

Eastbourne District General Hospital - Energy Management is an operational 1.1 MW solar farm in Eastbourne, generating since 31 October 2023. REPD does not record the planning grant date. Operator of record: East Sussex Healthcare NHS Trust.

1.1 MW
Capacity
as recorded in REPD
Operational
Status
since 31 October 2023
Solar Photovoltaics
Technology
East Sussex Healthcare NHS Trust
Eastbourne
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational31 October 2023

Screening a site of your own?

RedlineUK · £39

Eastbourne approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Eastbourne District General Hospital - Energy Management’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Eastbourne’s record on solar

Eastbourne has decided 6 solar farms and approved 100%, taking a median of 1.7 months. See every solar farm decision in Eastbourne

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.22.3 km
Wind Onshore · Operational
7.54.7 km
Solar Photovoltaics · Operational
8.96.9 km
Solar Photovoltaics · Operational
58.2 km
Solar Photovoltaics · Operational
8.210.2 km
EfW Incineration · Operational
18.312.5 km
Solar Photovoltaics · Operational
714 km
Solar Photovoltaics · Operational
11.514.6 km

How big is Eastbourne District General Hospital - Energy Management?

Eastbourne District General Hospital - Energy Management has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Eastbourne District General Hospital - Energy Management?

REPD records the operator as East Sussex Healthcare NHS Trust. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Eastbourne District General Hospital - Energy Management approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 31 October 2023.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12728.

Novarly Parcel · official public data, read properly · parcel.novarly.com