Renewable sitesEastbourne District General Hospital - Energy Management

Eastbourne District General Hospital - Energy Management

Eastbourne District General Hospital - Energy Management is operational in Eastbourne with a recorded capacity of 1.1 MW, and has been generating since 2023-10-31.

1.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-10-31
Solar Photovoltaics
Technology
East Sussex Healthcare NHS Trust
Eastbourne
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2023-10-31

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Eastbourne’s record on solar

Eastbourne has decided 6 solar farms and approved 100%, taking a median of 1.7 months. See every solar farm decision in Eastbourne

Other built sites within 15 km

SiteMWDistance
Tesco Lottbridge Drove
Solar Photovoltaics · Operational
0.22.3 km
Shepham Lane
Wind Onshore · Operational
7.54.7 km
Natewood Farm
Solar Photovoltaics · Operational
8.96.9 km
Wilbees Farm
Solar Photovoltaics · Operational
58.2 km
Berwick solar farm
Solar Photovoltaics · Operational
8.210.2 km
North Quay ERF
EfW Incineration · Operational
18.312.5 km
Laughton Level
Solar Photovoltaics · Operational
714 km
Pashley Farm
Solar Photovoltaics · Operational
11.514.6 km

How big is Eastbourne District General Hospital - Energy Management?

Eastbourne District General Hospital - Energy Management has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Eastbourne District General Hospital - Energy Management?

REPD records the operator as East Sussex Healthcare NHS Trust. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Eastbourne District General Hospital - Energy Management approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2023-10-31.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12728.