Mullardoch Tunnel

Mullardoch Tunnel is operational in Highland with a recorded capacity of 2.4 MW, and has been generating since 1955-01-01.

2.4 MW
Capacity
as recorded in REPD
Operational
Status
since 1955-01-01
Small Hydro
Technology
Scottish and Southern Energy (SSE)
Highland
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1955-01-01

Other built sites within 15 km

SiteMWDistance
Fasnakyle Hydro Extension
Large Hydro · Operational
7.59.1 km
Allt Garbh hydro
Small Hydro · Operational
1.510.2 km
Glenurquhart and Strathglass Wind Farm project
Wind Onshore · Operational
1013.4 km

How big is Mullardoch Tunnel?

Mullardoch Tunnel has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Mullardoch Tunnel?

REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Mullardoch Tunnel approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1955-01-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 467.