Renewable sitesMaw Green Landfill Site, Cheshire (Extension)

Maw Green Landfill Site, Cheshire (Extension)

Maw Green Landfill Site, Cheshire (Extension) is operational in Cheshire East with a recorded capacity of 2 MW, and has been generating since 2003-06-09.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2003-06-09
Landfill Gas
Technology
Waste Recycling Group
Cheshire East
Authority
England

Planning and build timeline

Application submitted1994-09-06
Permission granted1994-12-09
3 months after submission
Operational2003-06-09
102 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Maw Green Landfill Site
Landfill Gas · Operational
1.60 km
Bentley Motors
Solar Photovoltaics · Operational
2.93.4 km
Bentley Motors Ltd 1
Solar Photovoltaics · Operational
5.13.5 km
Land south of Wood Lane (Safeguard Bradwell)
Solar Photovoltaics · Operational
55.7 km
Land To The North Of Dairy House Farm
Solar Photovoltaics · Operational
3.46.1 km
London Road, Holmes Chapel Photovoltaic Panels
Solar Photovoltaics · Under Construction
0.9610.3 km

How big is Maw Green Landfill Site, Cheshire (Extension)?

Maw Green Landfill Site, Cheshire (Extension) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Maw Green Landfill Site, Cheshire (Extension)?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Maw Green Landfill Site, Cheshire (Extension) approved and built?

The application was submitted on 1994-09-06. Permission was granted on 1994-12-09, 3 months later. The site became operational on 2003-06-09, 102 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 658.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council