Novarly ParcelRenewable sites

Renewable sitesLower Bodiniel Farm

Lower Bodiniel Farm

Lower Bodiniel Farm is operational in Cornwall with a recorded capacity of 5 MW, and has been generating since 2012-03-15.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-03-15
Solar Photovoltaics
Technology
Wardell Armstrong International Ltd
Cornwall
Authority
England

Planning and build timeline

Application submitted2011-03-10
Permission granted2011-06-07
3 months after submission
Operational2012-03-15
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on solar

Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Bodmin 2 Solar Farm
Solar Photovoltaics · Operational
5.30.5 km
Newton Margate
Solar Photovoltaics · Operational
1.52.9 km
Margate Solar Farm
Solar Photovoltaics · Operational
33.2 km
Clann Solar Farm
Solar Photovoltaics · Operational
1.45.2 km
St. Breock Re-Power
Wind Onshore · Operational
106.1 km
Kerriers Solar Park
Solar Photovoltaics · Operational
9.67 km
Benbole Farm
Solar Photovoltaics · Operational
27.4 km
Rew Farm Solar Farm
Solar Photovoltaics · Operational
6.17.6 km

How big is Lower Bodiniel Farm?

Lower Bodiniel Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lower Bodiniel Farm?

REPD records the operator as Wardell Armstrong International Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lower Bodiniel Farm approved and built?

The application was submitted on 2011-03-10. Permission was granted on 2011-06-07, 3 months later. The site became operational on 2012-03-15, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1551.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council