Renewable sites › Benbole Farm
Benbole Farm
Benbole Farm is operational in Cornwall with a recorded capacity of 2 MW, and has been generating since 2011-07-28.
Planning and build timeline
| Application submitted | 2010-08-04 |
| Permission granted | 2010-12-20 5 months after submission |
| Operational | 2011-07-28 7 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Nutrient-neutrality catchment — River Camel SAC
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cornwall’s record on solar
Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Kellygreen Farm Solar Photovoltaics · Operational | 4 | 3.5 km |
St. Breock Re-Power Wind Onshore · Operational | 10 | 5.7 km |
Treswarrow Solar Park Solar Photovoltaics · Operational | 6.5 | 5.7 km |
Middle Treworder Farm Solar Photovoltaics · Operational | 5 | 5.9 km |
Bodmin 2 Solar Farm Solar Photovoltaics · Operational | 5.3 | 7.2 km |
Lower Bodiniel Farm Solar Photovoltaics · Operational | 5 | 7.4 km |
Hawksland Solar Solar Photovoltaics · Operational | 3.1 | 8.8 km |
Newton Margate Solar Photovoltaics · Operational | 1.5 | 9.7 km |
How big is Benbole Farm?
Benbole Farm has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Benbole Farm?
REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Benbole Farm approved and built?
The application was submitted on 2010-08-04. Permission was granted on 2010-12-20, 5 months later. The site became operational on 2011-07-28, 7 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1035.
Novarly Parcel · official public data, read properly · parcel.novarly.com