Kilbraur Windfarm

Kilbraur Windfarm is an operational 47.5 MW onshore wind farm in Highland, generating since 14 June 2008. Planning permission was granted on 1 April 2006, 31 months after submission. Operator of record: Renewable Development Company (RDC).

47.5 MW
Capacity
as recorded in REPD
Operational
Status
since 14 June 2008
Wind Onshore
Technology
Renewable Development Company (RDC)
Highland
Authority
Scotland

Planning and build timeline

Application submitted4 September 2003
Permission granted1 April 2006
31 months after submission
Operational14 June 2008
26 months after consent

Screening a site of your own?

RedlineUK · £39

Highland approves 63% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kilbraur Windfarm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
706.3 km
Wind Onshore · Operational
207.1 km
Wind Onshore · Operational
477.9 km

How big is Kilbraur Windfarm?

Kilbraur Windfarm has a recorded installed capacity of 47.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kilbraur Windfarm?

REPD records the operator as Renewable Development Company (RDC). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kilbraur Windfarm approved and built?

The application was submitted on 4 September 2003. Permission was granted on 1 April 2006, 31 months later. The site became operational on 14 June 2008, 26 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3202.

Novarly Parcel · official public data, read properly · parcel.novarly.com