Novarly ParcelRenewable sites

Renewable sitesInverclyde Wind Farm (Corlic Hill)

Inverclyde Wind Farm (Corlic Hill)

Inverclyde Wind Farm (Corlic Hill) is an operational 24 MW onshore wind farm in Inverclyde, generating since 20 February 2021. Planning permission was granted on 17 May 2016, 34 months after submission. Operator of record: BayWa r.e. (formerly Forsa).

24 MW
Capacity
as recorded in REPD
Operational
Status
since 20 February 2021
Wind Onshore
Technology
BayWa r.e. (formerly Forsa)
Inverclyde
Authority
Scotland

Planning and build timeline

Application submitted8 July 2013
Permission granted17 May 2016
34 months after submission
Operational20 February 2021
57 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Inverclyde: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Inverclyde Wind Farm (Corlic Hill)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
0.348.8 km
Solar Photovoltaics · Under Construction
0.1813.5 km

How big is Inverclyde Wind Farm (Corlic Hill)?

Inverclyde Wind Farm (Corlic Hill) has a recorded installed capacity of 24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Inverclyde Wind Farm (Corlic Hill)?

REPD records the operator as BayWa r.e. (formerly Forsa). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Inverclyde Wind Farm (Corlic Hill) approved and built?

The application was submitted on 8 July 2013. Permission was granted on 17 May 2016, 34 months later. The site became operational on 20 February 2021, 57 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4200.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode