Renewable sites › Faulds Park Road- Solar PV Panlels
Faulds Park Road- Solar PV Panlels
Faulds Park Road- Solar PV Panlels is a 0.34 MW solar farm under construction in Inverclyde. Planning permission was granted on 20 July 2022, 3 months after submission. Operator of record: Devol Engineering Limited.
Planning and build timeline
| Application submitted | 19 April 2022 |
| Permission granted | 20 July 2022 3 months after submission |
| Operational | not recorded |
Screening a site of your own?
Inverclyde approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Faulds Park Road- Solar PV Panlels’s recorded coordinate — swap in your own postcode or coordinates.
Inverclyde’s record on solar
Inverclyde has decided 6 solar farms and approved 100%, taking a median of 2 months. See every solar farm decision in Inverclyde →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 24 | 8.8 km |
How big is Faulds Park Road- Solar PV Panlels?
Faulds Park Road- Solar PV Panlels has a recorded installed capacity of 0.34 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Faulds Park Road- Solar PV Panlels?
REPD records the operator as Devol Engineering Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Faulds Park Road- Solar PV Panlels approved and built?
The application was submitted on 19 April 2022. Permission was granted on 20 July 2022, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11101.