Renewable sites › Carrochan Road, Balloch - Solar Panels
Carrochan Road, Balloch - Solar Panels
Carrochan Road, Balloch - Solar Panels is under construction in West Dunbartonshire with a recorded capacity of 0.18 MW.
Planning and build timeline
| Application submitted | 2023-06-22 |
| Permission granted | 2023-09-22 3 months after submission |
| Operational | not recorded |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Auchencarroch Landfill Landfill Gas · Operational | 2.1 | 2.7 km |
Auchencarroch Landfill Extension Landfill Gas · Operational | 2 | 2.7 km |
Inverclyde Wind Farm (Corlic Hill) Wind Onshore · Operational | 24 | 13.5 km |
How big is Carrochan Road, Balloch - Solar Panels?
Carrochan Road, Balloch - Solar Panels has a recorded installed capacity of 0.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Carrochan Road, Balloch - Solar Panels?
REPD records the operator as Loch Lomond and The Trossachs National Park. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Carrochan Road, Balloch - Solar Panels approved and built?
The application was submitted on 2023-06-22. Permission was granted on 2023-09-22, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14267.
Novarly Parcel · official public data, read properly · parcel.novarly.com