Novarly ParcelRenewable sites

Renewable sitesCarrochan Road, Balloch - Solar Panels

Carrochan Road, Balloch - Solar Panels

Carrochan Road, Balloch - Solar Panels is a 0.18 MW solar farm under construction in West Dunbartonshire. Planning permission was granted on 22 September 2023, 3 months after submission. Operator of record: Loch Lomond and The Trossachs National Park.

0.18 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Loch Lomond and The Trossachs National Park
West Dunbartonshire
Authority
Scotland

Planning and build timeline

Application submitted22 June 2023
Permission granted22 September 2023
3 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in West Dunbartonshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Carrochan Road, Balloch - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.12.7 km
Landfill Gas · Operational
22.7 km
Wind Onshore · Operational
2413.5 km

How big is Carrochan Road, Balloch - Solar Panels?

Carrochan Road, Balloch - Solar Panels has a recorded installed capacity of 0.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Carrochan Road, Balloch - Solar Panels?

REPD records the operator as Loch Lomond and The Trossachs National Park. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Carrochan Road, Balloch - Solar Panels approved and built?

The application was submitted on 22 June 2023. Permission was granted on 22 September 2023, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14267.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode