Renewable sites › Carrochan Road, Balloch - Solar Panels
Carrochan Road, Balloch - Solar Panels
Carrochan Road, Balloch - Solar Panels is a 0.18 MW solar farm under construction in West Dunbartonshire. Planning permission was granted on 22 September 2023, 3 months after submission. Operator of record: Loch Lomond and The Trossachs National Park.
Planning and build timeline
| Application submitted | 22 June 2023 |
| Permission granted | 22 September 2023 3 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in West Dunbartonshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Carrochan Road, Balloch - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 2.1 | 2.7 km |
Landfill Gas · Operational | 2 | 2.7 km |
Wind Onshore · Operational | 24 | 13.5 km |
How big is Carrochan Road, Balloch - Solar Panels?
Carrochan Road, Balloch - Solar Panels has a recorded installed capacity of 0.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Carrochan Road, Balloch - Solar Panels?
REPD records the operator as Loch Lomond and The Trossachs National Park. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Carrochan Road, Balloch - Solar Panels approved and built?
The application was submitted on 22 June 2023. Permission was granted on 22 September 2023, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14267.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode