Novarly ParcelRenewable sites

Renewable sitesGravel Pit Farm

Gravel Pit Farm

Gravel Pit Farm is an operational 1 MW anaerobic digestion plant in North Yorkshire, generating since 15 January 2016. Planning permission was granted on 17 February 2015, 5 months after submission. Operator of record: JFS Biogas.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 15 January 2016
Anaerobic Digestion
Technology
JFS Biogas
North Yorkshire
Authority
England

Planning and build timeline

Application submitted30 September 2014
Permission granted17 February 2015
5 months after submission
Operational15 January 2016
11 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Yorkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Gravel Pit Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Battery · Operational
49.98 km
Solar Photovoltaics · Operational
59.7 km
Solar Photovoltaics · Operational
0.1610.3 km

How big is Gravel Pit Farm?

Gravel Pit Farm has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gravel Pit Farm?

REPD records the operator as JFS Biogas. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gravel Pit Farm approved and built?

The application was submitted on 30 September 2014. Permission was granted on 17 February 2015, 5 months later. The site became operational on 15 January 2016, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4919.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode