Danes Moss Landfill Site

Danes Moss Landfill Site is an operational 1.6 MW landfill gas site in Cheshire East, generating since 1 July 1996. Planning permission was granted on 25 January 1995, 27 months after submission. Operator of record: Waste Recycling Group.

1.6 MW
Capacity
as recorded in REPD
Operational
Status
since 1 July 1996
Landfill Gas
Technology
Waste Recycling Group
Cheshire East
Authority
England

Planning and build timeline

Application submitted16 October 1992
Permission granted25 January 1995
27 months after submission
Operational1 July 1996
17 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Cheshire East: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Danes Moss Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
20 km
Solar Photovoltaics · Under Construction
2.514 km
Solar Photovoltaics · Under Construction
0.9614.7 km

How big is Danes Moss Landfill Site?

Danes Moss Landfill Site has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Danes Moss Landfill Site?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Danes Moss Landfill Site approved and built?

The application was submitted on 16 October 1992. Permission was granted on 25 January 1995, 27 months later. The site became operational on 1 July 1996, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 570.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode