Renewable sitesConnon Bridge Landfill Gas Project

Connon Bridge Landfill Gas Project

Connon Bridge Landfill Gas Project is operational in Cornwall with a recorded capacity of 5.2 MW, and has been generating since 2002-03-15.

5.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2002-03-15
Landfill Gas
Technology
Combined Landfill Projects (CLP Envirogas)
Cornwall
Authority
England

Planning and build timeline

Application submitted2000-06-01
Permission granted2001-07-31
14 months after submission
Operational2002-03-15
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Connon Bridge Landfill
Landfill Gas · Operational
10.1 km
Langunnett Solar Farm
Solar Photovoltaics · Operational
6.25.8 km
Pensipple Farm
Solar Photovoltaics · Operational
57.6 km
Polmaugan Farm
Solar Photovoltaics · Operational
58.1 km
Higher Trevartha Farm
Solar Photovoltaics · Operational
38.9 km
Rew Farm Solar Farm
Solar Photovoltaics · Operational
6.110.1 km
Margate Solar Farm
Solar Photovoltaics · Operational
311.1 km
Newton Margate
Solar Photovoltaics · Operational
1.511.4 km

How big is Connon Bridge Landfill Gas Project?

Connon Bridge Landfill Gas Project has a recorded installed capacity of 5.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Connon Bridge Landfill Gas Project?

REPD records the operator as Combined Landfill Projects (CLP Envirogas). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Connon Bridge Landfill Gas Project approved and built?

The application was submitted on 2000-06-01. Permission was granted on 2001-07-31, 14 months later. The site became operational on 2002-03-15, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 727.