Novarly ParcelRenewable sites

Renewable sitesConnon Bridge Landfill

Connon Bridge Landfill

Connon Bridge Landfill is operational in Cornwall with a recorded capacity of 1 MW, and has been generating since 2003-07-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2003-07-01
Landfill Gas
Technology
County Environmental Services
Cornwall
Authority
England

Planning and build timeline

Application submitted2003-11-06
Permission grantednot recorded
Operational2003-07-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Connon Bridge Landfill Gas Project
Landfill Gas · Operational
5.20.1 km
Langunnett Solar Farm
Solar Photovoltaics · Operational
6.25.9 km
Pensipple Farm
Solar Photovoltaics · Operational
57.6 km
Polmaugan Farm
Solar Photovoltaics · Operational
58.2 km
Higher Trevartha Farm
Solar Photovoltaics · Operational
38.8 km
Rew Farm Solar Farm
Solar Photovoltaics · Operational
6.110.2 km
Margate Solar Farm
Solar Photovoltaics · Operational
311.2 km
Newton Margate
Solar Photovoltaics · Operational
1.511.4 km

How big is Connon Bridge Landfill?

Connon Bridge Landfill has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Connon Bridge Landfill?

REPD records the operator as County Environmental Services. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Connon Bridge Landfill approved and built?

The application was submitted on 2003-11-06. REPD does not record a grant date. The site became operational on 2003-07-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 633.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council