Clachan Flats Wind Farm

Clachan Flats Wind Farm is operational in Argyll and Bute with a recorded capacity of 15 MW, and has been generating since 2008-12-01.

15 MW
Capacity
as recorded in REPD
Operational
Status
since 2008-12-01
Wind Onshore
Technology
AMEC/ Border Winds
Argyll and Bute
Authority
Scotland

Planning and build timeline

Application submitted2002-05-15
Permission granted2004-07-08
26 months after submission
Operational2008-12-01
53 months after consent

Argyll and Bute’s record on onshore wind

Argyll and Bute has decided 38 onshore wind schemes and approved 58%, taking a median of 14.7 months. See every onshore wind scheme decision in Argyll and Bute

Other built sites within 15 km

SiteMWDistance
Glen Fyne 'Merk' Hydro
Small Hydro · Operational
19.6 km
Eas a Ghaill
Small Hydro · Operational
1.513 km
River Lochy Hydro
Small Hydro · Operational
213.1 km
Donich Water Hydro
Small Hydro · Operational
1.413.5 km
Craig Farm
Small Hydro · Under Construction
0.413.7 km
Ben Glas
Small Hydro · Operational
1.314.7 km

How big is Clachan Flats Wind Farm?

Clachan Flats Wind Farm has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Clachan Flats Wind Farm?

REPD records the operator as AMEC/ Border Winds. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Clachan Flats Wind Farm approved and built?

The application was submitted on 2002-05-15. Permission was granted on 2004-07-08, 26 months later. The site became operational on 2008-12-01, 53 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3448.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council