Renewable sites › Capeland Farm
Capeland Farm
Capeland Farm is an operational 8.3 MW solar farm in North Devon, generating since 27 February 2015. Planning permission was granted on 28 February 2014, 8 months after submission. Operator of record: juwi Renewable Energies.
Planning and build timeline
| Application submitted | 19 June 2013 |
| Permission granted | 28 February 2014 8 months after submission |
| Operational | 27 February 2015 12 months after consent |
Screening a site of your own?
North Devon approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Capeland Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Devon’s record on solar
North Devon has decided 23 solar farms and approved 96%, taking a median of 4.9 months. See every solar farm decision in North Devon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 1.3 km |
Solar Photovoltaics · Operational | 5 | 12.9 km |
Wind Onshore · Operational | 66 | 13.9 km |
Battery · Operational | 3.8 | 14.6 km |
Solar Photovoltaics · Operational | 2 | 14.7 km |
How big is Capeland Farm?
Capeland Farm has a recorded installed capacity of 8.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Capeland Farm?
REPD records the operator as juwi Renewable Energies. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Capeland Farm approved and built?
The application was submitted on 19 June 2013. Permission was granted on 28 February 2014, 8 months later. The site became operational on 27 February 2015, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1943.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode