Bodorgan Solar Farm is an operational 12.6 MW solar farm in Isle of Anglesey, generating since 20 June 2014. Planning permission was granted on 9 February 2013, 3 months after submission. Operator of record: Anesco.

12.6 MW
Capacity
as recorded in REPD
Operational
Status
since 20 June 2014
Solar Photovoltaics
Technology
Anesco
Isle of Anglesey
Authority
Wales

Planning and build timeline

Application submitted15 November 2012
Permission granted9 February 2013
3 months after submission
Operational20 June 2014
16 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Isle of Anglesey: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bodorgan Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
156.1 km
Solar Photovoltaics · Operational
13.911.7 km

How big is Bodorgan Solar Farm?

Bodorgan Solar Farm has a recorded installed capacity of 12.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bodorgan Solar Farm?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bodorgan Solar Farm approved and built?

The application was submitted on 15 November 2012. Permission was granted on 9 February 2013, 3 months later. The site became operational on 20 June 2014, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2104.