Boulfruich

Boulfruich is an operational 13 MW onshore wind farm in Highland, generating since 1 August 2005. Planning permission was granted on 29 May 2002, 8 months after submission. Operator of record: Private Developer.

13 MW
Capacity
as recorded in REPD
Operational
Status
since 1 August 2005
Wind Onshore
Technology
Private Developer
Highland
Authority
Scotland

Planning and build timeline

Application submitted17 September 2001
Permission granted29 May 2002
8 months after submission
Operational1 August 2005
38 months after consent

Screening a site of your own?

RedlineUK · £39

Highland approves 63% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Boulfruich’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
0.26.3 km
Wind Onshore · Under Construction
72.68.5 km
Wind Onshore · Operational
26.713.5 km
Wind Onshore · Operational
3414.6 km

How big is Boulfruich?

Boulfruich has a recorded installed capacity of 13 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Boulfruich?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Boulfruich approved and built?

The application was submitted on 17 September 2001. Permission was granted on 29 May 2002, 8 months later. The site became operational on 1 August 2005, 38 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3126.