Renewable sitesB and Q Distribution Centre Highworth Road

B and Q Distribution Centre Highworth Road

B and Q Distribution Centre Highworth Road is operational in Swindon, and has been generating since 2018-10-01.

Capacity
as recorded in REPD
Operational
Status
since 2018-10-01
Battery
Technology
Kingfisher / Solar Century
Swindon
Authority
England

Planning and build timeline

Application submitted2018-06-29
Permission granted2018-08-21
2 months after submission
Operational2018-10-01
1 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Swindon’s record on battery storage

Swindon has decided 6 battery storage schemes and approved 100%, taking a median of 6.2 months. See every battery storage scheme decision in Swindon

Other built sites within 15 km

SiteMWDistance
B&Q Swindon DC
Solar Photovoltaics · Operational
2.50 km
Land at Beech Farm
Solar Photovoltaics · Operational
4.60.8 km
Corner Copse Solar Farm
Solar Photovoltaics · Under Construction
49.91.7 km
Corner Copse Solar Farm
Battery · Under Construction
1.7 km
Sevor Farm
Solar Photovoltaics · Operational
9.32 km
Stanton solar park
Solar Photovoltaics · Operational
52.2 km
Arkwright Road, Groundwell Industrial Estate - Solar Panels
Solar Photovoltaics · Under Construction
0.912.2 km
Roves Farm (Solar)
Solar Photovoltaics · Operational
12.73.1 km

How big is B and Q Distribution Centre Highworth Road?

REPD does not record an installed capacity for B and Q Distribution Centre Highworth Road.

Who operates B and Q Distribution Centre Highworth Road?

REPD records the operator as Kingfisher / Solar Century. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was B and Q Distribution Centre Highworth Road approved and built?

The application was submitted on 2018-06-29. Permission was granted on 2018-08-21, 2 months later. The site became operational on 2018-10-01, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7981.