Arlington Energy Battery Storage

Arlington Energy Battery Storage is under construction in Rother.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Arlington Energy Limited
Rother
Authority
England

Planning and build timeline

Application submitted2020-10-07
Permission granted2021-02-09
4 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
St Francis Farm
Solar Photovoltaics · Operational
40.8 km
Pashley Farm
Solar Photovoltaics · Operational
11.52.3 km
Pebsham
Landfill Gas · Operational
35.5 km
Pebsham (Extension)
Landfill Gas · Operational
15.5 km
Shepham Lane
Wind Onshore · Operational
7.514.4 km

How big is Arlington Energy Battery Storage?

REPD does not record an installed capacity for Arlington Energy Battery Storage.

Who operates Arlington Energy Battery Storage?

REPD records the operator as Arlington Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Arlington Energy Battery Storage approved and built?

The application was submitted on 2020-10-07. Permission was granted on 2021-02-09, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8207.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council