Renewable sites › Arlington Energy Battery Storage
Arlington Energy Battery Storage
Arlington Energy Battery Storage is a battery storage site under construction in Rother. Planning permission was granted on 9 February 2021, 4 months after submission. Operator of record: Arlington Energy Limited.
Planning and build timeline
| Application submitted | 7 October 2020 |
| Permission granted | 9 February 2021 4 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Rother: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Arlington Energy Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 4 | 0.8 km |
Solar Photovoltaics · Operational | 11.5 | 2.3 km |
Landfill Gas · Operational | 3 | 5.5 km |
Landfill Gas · Operational | 1 | 5.5 km |
Wind Onshore · Operational | 7.5 | 14.4 km |
How big is Arlington Energy Battery Storage?
REPD does not record an installed capacity for Arlington Energy Battery Storage.
Who operates Arlington Energy Battery Storage?
REPD records the operator as Arlington Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Arlington Energy Battery Storage approved and built?
The application was submitted on 7 October 2020. Permission was granted on 9 February 2021, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8207.