Novarly ParcelRenewable sites

Renewable sitesAiries Farm

Airies Farm

Airies Farm is an operational 35 MW onshore wind farm in Dumfries and Galloway, generating since 15 March 2017. Planning permission was granted on 1 March 2013, 6 months after submission. Operator of record: NTR.

35 MW
Capacity
as recorded in REPD
Operational
Status
since 15 March 2017
Wind Onshore
Technology
NTR
Dumfries and Galloway
Authority
Scotland

Planning and build timeline

Application submitted24 August 2012
Permission granted1 March 2013
6 months after submission
Operational15 March 2017
48 months after consent

Screening a site of your own?

RedlineUK · £39

Dumfries and Galloway approves 67% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Airies Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Dumfries and Galloway’s record on onshore wind

Dumfries and Galloway has decided 55 onshore wind schemes and approved 67%, taking a median of 18.5 months. See every onshore wind scheme decision in Dumfries and Galloway

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
15.37.8 km
Wind Onshore · Operational
8.111 km
Wind Onshore · Operational
9.112 km

How big is Airies Farm?

Airies Farm has a recorded installed capacity of 35 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Airies Farm?

REPD records the operator as NTR. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Airies Farm approved and built?

The application was submitted on 24 August 2012. Permission was granted on 1 March 2013, 6 months later. The site became operational on 15 March 2017, 48 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4462.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode