Novarly ParcelRenewable sites

Renewable sitesBalmurrie Fell Wind Farm

Balmurrie Fell Wind Farm

Balmurrie Fell Wind Farm is operational in Dumfries and Galloway with a recorded capacity of 9.1 MW, and has been generating since 2012-09-01.

9.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-09-01
Wind Onshore
Technology
Scottish Southern Energy
Dumfries and Galloway
Authority
Scotland

Planning and build timeline

Application submitted2009-06-30
Permission granted2011-11-25
29 months after submission
Operational2012-09-01
9 months after consent

Dumfries and Galloway’s record on onshore wind

Dumfries and Galloway has decided 55 onshore wind schemes and approved 67%, taking a median of 18.5 months. See every onshore wind scheme decision in Dumfries and Galloway

Other built sites within 15 km

SiteMWDistance
Airies Farm
Wind Onshore · Operational
3512 km
Carscreugh Renewable Energy Park
Wind Onshore · Operational
15.313.7 km

How big is Balmurrie Fell Wind Farm?

Balmurrie Fell Wind Farm has a recorded installed capacity of 9.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Balmurrie Fell Wind Farm?

REPD records the operator as Scottish Southern Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Balmurrie Fell Wind Farm approved and built?

The application was submitted on 2009-06-30. Permission was granted on 2011-11-25, 29 months later. The site became operational on 2012-09-01, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4445.