Solar planning in South Ayrshire

South Ayrshire has decided 4 solar farms and approved 100% of them, taking a median of 1.8 months to decide. Consented capacity: 2 MW. 2 applications still awaiting a decision.

100%
Approved
4 granted · 0 refused
1.8 mo
Median decision
UK 2.3 mo
2 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (4 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How South Ayrshire compares

Against the 298 UK authorities with 5+ solar decisions, South Ayrshire sits in the 77th percentile for approval rate (7 points above the England average) and the 74th percentile for speed.

Decisions by year

35Approved — 3 (2023)323Approved — 1 (2024)124
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (7)

SchemeMWStatusDecided
Air Traffic Control Centre, Fresson Avenue - Solar PV Panels
NATS · 24/00540/APP · 4.2 mo to decide
0.46Awaiting Construction2024-11-21
Hillhouse Quarry, Railway Bridge - Solar Array
Hillhouse Quarry Company Limited · 24/00424/APP
3Application Submitted2024-06-05
Air Traffic Control Centre, Fresson Avenue - Solar PV Panels
NATS · 23/00674/APPM · 2.1 mo to decide
0.7Revised2023-12-08
Enterkine House, Annbank - Solar Panels
Enterkine House Hotel · 23/00567/APP · 2 mo to decide
0.16Awaiting Construction2023-10-30
Craig Tara Holiday Park, Dunure Road - Solar Panels
Bourne Leisure Limited · 23/00299/APP · 0.8 mo to decide
0.71Awaiting Construction2023-07-17
Ladywell Avenue - Solar Panels
Land Energy Girvan Limited · 22/00961/APP · 1.7 mo to decide
0.25Awaiting Construction2023-02-02
Nethermains
North Ayrshire Council · 15/00568/PP · 1.6 mo to decide
5Abandoned2015-12-01

Does South Ayrshire approve solar farms?

Yes — of the 4 solar farms South Ayrshire has decided, 100% were approved (4 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in South Ayrshire?

The median time from application to decision is 1.8 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has South Ayrshire consented?

2 MW has been consented across 4 approved schemes. A further 2 applications awaits a decision.

Other technologies in South Ayrshire

Battery storage in South AyrshireOnshore wind in South Ayrshire

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.