Renewable planning › Solar › Rossendale
Solar planning in Rossendale
Rossendale has decided 1 solar farm and approved 100% of them, taking a median of 2.1 months to decide. Consented capacity: 1 MW.
⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Rossendale compares
Against the 298 UK authorities with 5+ solar decisions, Rossendale sits in the 77th percentile for approval rate (7 points above the England average) and the 56th percentile for speed.
Every recorded scheme (1)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Paragon Works, Rising Bridge Road - Solar Farm Locogen Limited · 2025/0025 · 2.1 mo to decide | 1 | Awaiting Construction | 2025-04-02 |
Does Rossendale approve solar farms?
Yes — of the 1 solar farms Rossendale has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a solar farm application take in Rossendale?
The median time from application to decision is 2.1 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much solar capacity has Rossendale consented?
1 MW has been consented across 1 approved scheme. There are no applications currently awaiting a decision.
Other technologies in Rossendale
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.
Novarly Parcel · official public data, read properly · parcel.novarly.com
Screen a specific site here · All authorities · UK property report