Battery storage planning in Rossendale

Rossendale has decided 2 battery storage schemes and approved 50% of them, taking a median of 4.5 months to decide. Consented capacity: 10 MW.

50%
Approved
1 granted · 1 refused
4.5 mo
Median decision
UK 6 mo
10 MW
Consented
85 MW refused
0
Appeals
no appeals recorded

⚠️ Small caseload (2 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Rossendale compares

Against the 137 UK authorities with 5+ battery storage decisions, Rossendale sits in the 1st percentile for approval rate (42 points below the England average) and the 68th percentile for speed.

Decisions by year

35Approved — 1 (2021)121Refused — 1 (2025)125
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (2)

SchemeMWStatusDecided
Rochdale Road, Edenfield - Battery Storage
Cubico Limited · 2024/0501 · 5.2 mo to decide
85Application Refused2025-09-16
Park Road Battery Storage
Arlington Energy Limited Avery Energy · 2021/0456 · 3.7 mo to decide
10Awaiting Construction2021-11-19

Does Rossendale approve battery storage schemes?

Yes — of the 2 battery storage schemes Rossendale has decided, 50% were approved (1 granted, 1 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Rossendale?

The median time from application to decision is 4.5 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Rossendale consented?

10 MW has been consented across 1 approved scheme, with 85 MW refused. There are no applications currently awaiting a decision.

Other technologies in Rossendale

Solar in RossendaleOnshore wind in Rossendale

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.