Onshore wind planning in Gedling

Gedling has decided 3 onshore wind schemes and approved 67% of them, taking a median of 12.5 months to decide. Consented capacity: 3 MW.

67%
Approved
2 granted · 1 refused
12.5 mo
Median decision
UK 11.5 mo
3 MW
Consented
3 MW refused
0
Appeals
no appeals recorded

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Gedling compares

Against the 75 UK authorities with 5+ onshore wind decisions, Gedling sits in the 45th percentile for approval rate (1 points below the England average) and the 58th percentile for speed.

Decisions by year

35Refused — 1 (2012)112Approved — 1 (2013)113Approved — 1 (2015)115
Approved Refused

Onshore wind decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (3)

SchemeMWStatusDecided
Newstead and Annesley Wind Turbine
Redpath Energy · 2014/1168 · 12.5 mo to decide
1.5Operational2015-10-20
Severn Trent Water - Stoke Bardolph Wind Turbine
Severn Trent Water · 2012/1472 · 9.2 mo to decide
1.5Operational2013-09-19
Stoke Bardolph Farm
Severn Trent Water · 2010/0289 · 24.1 mo to decide
3.4Application Refused2012-04-04

Does Gedling approve onshore wind schemes?

Yes — of the 3 onshore wind schemes Gedling has decided, 67% were approved (2 granted, 1 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Gedling?

The median time from application to decision is 12.5 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Gedling consented?

3 MW has been consented across 2 approved schemes, with 3 MW refused. There are no applications currently awaiting a decision.

Other technologies in Gedling

Solar in GedlingBattery storage in Gedling

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.