Renewable planning › Battery storage › Gedling
Battery storage planning in Gedling
Gedling has decided 1 battery storage scheme and approved 100% of them, taking a median of 10.8 months to decide. Consented capacity: 320 MW.
⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Gedling compares
Against the 137 UK authorities with 5+ battery storage decisions, Gedling sits in the 73rd percentile for approval rate (8 points above the England average) and the 10th percentile for speed.
Every recorded scheme (1)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Burton Wood Farm, Spring Lane - Battery Energy Storage Grenergy Renewables · 2024/0269 · 10.8 mo to decide | 320 | Awaiting Construction | 2025-03-27 |
Does Gedling approve battery storage schemes?
Yes — of the 1 battery storage schemes Gedling has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in Gedling?
The median time from application to decision is 10.8 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Gedling consented?
320 MW has been consented across 1 approved scheme. There are no applications currently awaiting a decision.
Other technologies in Gedling
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.
Novarly Parcel · official public data, read properly · parcel.novarly.com
Screen a specific site here · All authorities · UK property report