Novarly ParcelRenewable planning

Renewable planning Onshore windBoston

Onshore wind planning in Boston

Boston has decided 1 onshore wind scheme and approved 100% of them, taking a median of 19.2 months to decide. Consented capacity: 27 MW.

100%
Approved
1 granted · 0 refused
19.2 mo
Median decision
UK 11.5 mo
27 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Boston compares

Against the 75 UK authorities with 5+ onshore wind decisions, Boston sits in the 98th percentile for approval rate (32 points above the England average) and the 20th percentile for speed.

Every recorded scheme (1)

SchemeMWStatusDecided
Bicker Fen
Wind Prospect · B/03/0189 · 19.2 mo to decide
26.7Operational2004-10-15

Does Boston approve onshore wind schemes?

Yes — of the 1 onshore wind schemes Boston has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Boston?

The median time from application to decision is 19.2 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Boston consented?

27 MW has been consented across 1 approved scheme. There are no applications currently awaiting a decision.

Other technologies in Boston

Solar in BostonBattery storage in Boston

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report