Novarly ParcelRenewable planning

Renewable planning Battery storageBabergh

Battery storage planning in Babergh

Babergh has decided 5 battery storage schemes and approved 100% of them, taking a median of 1.8 months to decide. Consented capacity: 6 MW. 1 application still awaiting a decision.

100%
Approved
5 granted · 0 refused
1.8 mo
Median decision
UK 6 mo
6 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Babergh compares

Against the 137 UK authorities with 5+ battery storage decisions, Babergh sits in the 73rd percentile for approval rate (8 points above the England average) and the 97th percentile for speed.

Decisions by year

35Approved — 1 (2023)123Approved — 1 (2024)124Approved — 3 (2025)325
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (7)

SchemeMWStatusDecided
Woodhall Business Park - Micro Energy Storage System
AMP Clean Energy · DC/25/00709 · 1.8 mo to decide
0.2Awaiting Construction2025-04-14
Alexandra Road, Windham Road - Energy Storage System
AMP Clean Energy · DC/25/00708 · 1.7 mo to decide
0.2Awaiting Construction2025-04-09
Curzon Road, Chilton Industrial Estate - Micro Energy Storage
AMP Clean Energy · DC/25/00711 · 1.7 mo to decide
0.2Awaiting Construction2025-04-08
Beaumont Park, Red Hill Road - Micro Energy Storage
AMP Clean Energy · DC/25/00710
0.2Application Withdrawn2025-03-19
Park Farm House, Vicarage Lane - Energy Storage System
AMP Energy Services Limited · DC/24/00442 · 1.8 mo to decide
0.2Awaiting Construction2024-03-26
Coxhall Road, Tattingstone - Battery Storage
AMP Energy Services Limited · DC/22/05668 · 2.1 mo to decide
5Awaiting Construction2023-01-17
Coxhall Road, Tattingstone - Battery Storage
AMP Energy Services Limited · DC/22/03862
5Revised2022-09-26

Does Babergh approve battery storage schemes?

Yes — of the 5 battery storage schemes Babergh has decided, 100% were approved (5 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Babergh?

The median time from application to decision is 1.8 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Babergh consented?

6 MW has been consented across 5 approved schemes. A further 1 application awaits a decision.

Other technologies in Babergh

Solar in BaberghOnshore wind in Babergh

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report