Renewable planning Onshore windBabergh

Onshore wind planning in Babergh

Babergh has decided 1 onshore wind scheme and approved 0% of them, taking a median of 12.3 months to decide.

0%
Approved
0 granted · 1 refused
12.3 mo
Median decision
UK 11.5 mo
0 MW
Consented
3 MW refused
0
Appeals
no appeals recorded

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Babergh compares

Against the 75 UK authorities with 5+ onshore wind decisions, Babergh sits in the 0th percentile for approval rate (68 points below the England average) and the 59th percentile for speed.

Every recorded scheme (1)

SchemeMWStatusDecided
Pannington Hall
Partnerships for Renewables · B/13/01476 · 12.3 mo to decide
3Application Refused2014-12-17

Does Babergh approve onshore wind schemes?

Yes — of the 1 onshore wind schemes Babergh has decided, 0% were approved (0 granted, 1 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Babergh?

The median time from application to decision is 12.3 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Babergh consented?

0 MW has been consented across 0 approved schemes, with 3 MW refused. There are no applications currently awaiting a decision.

Other technologies in Babergh

Solar in BaberghBattery storage in Babergh

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.