Battery storage planning in Mid and East Antrim

Mid and East Antrim has decided 3 battery storage schemes and approved 100% of them, taking a median of 6.9 months to decide. Consented capacity: 86 MW. 2 applications still awaiting a decision.

100%
Approved
3 granted · 0 refused
6.9 mo
Median decision
UK 6 mo
86 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Mid and East Antrim compares

Against the 137 UK authorities with 5+ battery storage decisions, Mid and East Antrim sits in the 73rd percentile for approval rate (8 points above the England average) and the 36th percentile for speed.

Every recorded scheme (5)

SchemeMWStatusDecided
Battery Energy Storage System in Broughshane
Heron Energy Limited · LA02/2023/1884/F · 3.7 mo to decide
1Awaiting Construction2024-02-09
Quarterland Road, Islandmagee - Battery Storage
Solo Renewables Ltd · LA02/2023/1283/F · 10.2 mo to decide
75Awaiting Construction2024-01-19
Power Generation Development in Islandmagee
Heron Storage Limited · LA02/2023/1577/F
100Application Submitted2023-06-27
Carnbuck Wind Farm
RES Limited · SPD/2023/0951/F
Application Submitted2023-02-22
AES Kilroot Station Battery Storage Array
AES Kilroot Power (AES KPL)
10Operational

Does Mid and East Antrim approve battery storage schemes?

Yes — of the 3 battery storage schemes Mid and East Antrim has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Mid and East Antrim?

The median time from application to decision is 6.9 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Mid and East Antrim consented?

86 MW has been consented across 3 approved schemes. A further 2 applications awaits a decision.

Other technologies in Mid and East Antrim

Solar in Mid and East AntrimOnshore wind in Mid and East Antrim

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com