Battery storage planning in Causeway Coast and Glens
Causeway Coast and Glens has decided 3 battery storage schemes and approved 67% of them, taking a median of 10.7 months to decide. Consented capacity: 1 MW. 1 application still awaiting a decision.
⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Causeway Coast and Glens compares
Against the 137 UK authorities with 5+ battery storage decisions, Causeway Coast and Glens sits in the 4th percentile for approval rate (25 points below the England average) and the 10th percentile for speed.
Every recorded scheme (4)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Energy Storage System Installation in Rasharkin Renewable Energy Systems (RES) · LA01/2025/0181/F | 100 | Application Submitted | 2025-02-28 |
Finvoy Road, Rasharkin - Battery Storage AESS NI Limited · LA01/2023/0271/F · 17.7 mo to decide | — | Awaiting Construction | 2024-08-30 |
Battery Energy Storage System in Ballycastle HHT Renewables Ltd · LA01/2023/1223/F · 3.7 mo to decide | 1 | Awaiting Construction | 2024-03-20 |
Armoy Wind Farm ABO Wind NI · LA01/2017/1654/F | — | Appeal Refused | 2017-12-22 |
Does Causeway Coast and Glens approve battery storage schemes?
Yes — of the 3 battery storage schemes Causeway Coast and Glens has decided, 67% were approved (2 granted, 1 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in Causeway Coast and Glens?
The median time from application to decision is 10.7 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Causeway Coast and Glens consented?
1 MW has been consented across 2 approved schemes. A further 1 application awaits a decision.
Other technologies in Causeway Coast and Glens
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.