Novarly ParcelRenewable planning

Renewable planning Battery storageAntrim and Newtownabbey

Battery storage planning in Antrim and Newtownabbey

Antrim and Newtownabbey has decided 5 battery storage schemes and approved 100% of them, taking a median of 13.1 months to decide. Consented capacity: 54 MW. 1 application still awaiting a decision.

100%
Approved
5 granted · 0 refused
13.1 mo
Median decision
UK 6 mo
54 MW
Consented
across approved schemes
1
Appeals
1 allowed on appeal

⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Antrim and Newtownabbey compares

Against the 137 UK authorities with 5+ battery storage decisions, Antrim and Newtownabbey sits in the 73rd percentile for approval rate (8 points above the England average) and the 6th percentile for speed.

Decisions by year

35Approved — 1 (2019)119Approved — 1 (2022)122Approved — 1 (2024)124Approved — 2 (2025)225
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (6)

SchemeMWStatusDecided
Battery Energy Storage System Development in Ballymena
Heron Energy Limited · LA03/2024/0182/F · 17.6 mo to decide
Awaiting Construction2025-08-29
Carncome, Lislunnan Road - Battery Energy Storage
Valor Power Limited · LA03/2025/0496/F
150Application Submitted2025-07-07
Battery Energy Storage System Facility in Antrim
Heron Storage Limited · LA03/2024/0351/F · 10.2 mo to decide
50Awaiting Construction2025-03-21
HHT Battery Energy Storage System in Randalstown
HHT Renewables Ltd · LA03/2023/0901/F · 8.1 mo to decide
1Awaiting Construction2024-08-01
Dunore Point Treatment Works
NI Water · LA03/20/0858/F · 17.5 mo to decide
3Awaiting Construction2022-05-18
Kells Substation
Kells Bes (ABO Wind) · LA03/2018/0984/F · 13.1 mo to decide
Awaiting Construction2019-11-27

Does Antrim and Newtownabbey approve battery storage schemes?

Yes — of the 5 battery storage schemes Antrim and Newtownabbey has decided, 100% were approved (5 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Antrim and Newtownabbey?

The median time from application to decision is 13.1 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Antrim and Newtownabbey consented?

54 MW has been consented across 5 approved schemes. A further 1 application awaits a decision.

Other technologies in Antrim and Newtownabbey

Solar in Antrim and NewtownabbeyOnshore wind in Antrim and Newtownabbey

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report