Ystradffin Hydropower Project

Ystradffin Hydropower Project is a 1.8 MW hydro scheme under construction in Carmarthenshire. Planning permission was granted on 29 November 2022, 71 months after submission. Operator of record: Hydro Electric Development.

1.8 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Small Hydro
Technology
Hydro Electric Development
Carmarthenshire
Authority
Wales

Planning and build timeline

Application submitted21 December 2016
Permission granted29 November 2022
71 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Carmarthenshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ystradffin Hydropower Project’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Small Hydro · Operational
4.42.8 km

How big is Ystradffin Hydropower Project?

Ystradffin Hydropower Project has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ystradffin Hydropower Project?

REPD records the operator as Hydro Electric Development. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ystradffin Hydropower Project approved and built?

The application was submitted on 21 December 2016. Permission was granted on 29 November 2022, 71 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6366.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode