Renewable sites › Striven
Striven
Striven is operational in Argyll and Bute with a recorded capacity of 8 MW, and has been generating since 1951-01-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1951-01-01 |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Cruach Mhor Wind Onshore · Operational | 33.3 | 4 km |
Killail Farm Small Hydro · Operational | 0.2 | 12.2 km |
Loch Gair Large Hydro · Operational | 6 | 14.7 km |
How big is Striven?
Striven has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Striven?
REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Striven approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1951-01-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 397.
Novarly Parcel · official public data, read properly · parcel.novarly.com